Image
The internal remodelling of a primary school loacted within the lower levels of the Grade 1 listed Bristol Central Library.
Image
Image
This project for Cathedral Primary school involved the creation of additional classroom space through the reconfiguration of the neighbouring library. The project included the creation of a new classroom space, a new staff room and new WCs for the library staff.
Image
As a grade 1 listed building, the works required extensive discussion with the local authority's conservation team to ensure no harm cam to the herritage asset.
Image
Client
Cathedral Primary School and Bristol Library
Location
Bristol
Date
2020
Contractor
John Perkins Construction
PM QS
Atkins Realis
Architect
Studio Lime Architects
Structural
Craddys
MEP
BJP