, 21 Apr, 2015
The project involved the construction of a new, stand-alone dining hall to serve a city center primary school in North Bristol. It replaced a 1950s timber framed annex that had come to the end of its life and was proving too small for the number of pupils at the school. The building includes a large…
Read More →
, 09 Dec, 2024
An exciting new nursery in Southville, Bristol, the project sees the conversion of the disused Holy Cross Church on Dean Lane to create a 162 place nursery and pre-school. This will include: The restoration of the existing, derelict building. The demolition of a 1960’s extension and the construction of a new kitchen wing. New external…
Read More →
, 09 Dec, 2024
Our newly opened expansion project for Forest and Sandridge Primary School opened on time and on budget for Autumn term 2023. The project involves increasing the capacity of a modern primary school building, with associated upgrades to the existing facilities and includes 3 main elements of work: A four classroom extension with a new WC…
Read More →
, 09 Dec, 2024
The refurbishment of the catering and welfare facilities at St David’s Catholic College | Coleg Catholig Dewi Sant. Tthe project see the introduction of a new commercial kitchen and servery, remodelled student WCs at each level and new staff welfare facilities. The project was completed for September 2024, Client: St David’s Catholic College | Coleg…
Read More →
, 09 Dec, 2024
A new dining hall for Kings Oak High School in East Bristol. The building was delivered using volumetric modular technology, resulting in a rapid on-site installation. The building includes: a large, flexible dining hall; outdoor seating; pupil was; and a commercial kitchen.
, 09 Dec, 2024
This project saw the delivery of new teaching laboratories at Hans price Academy, Weston-super-Mare for Cabot Learning Federation The works were design and procured under a very challenging programme and were delivered on time for the September 2022 opening. Project Managers: Atkins Realis Architect: Studio Lime MEP: BJP Structural Engineer: Craddys Main Contractor: 21CBS
, 28 Dec, 2022
Studio Lime provided Architectural and Project Management services for the refurbishment of the School sports centres for Henley Bank High School and Holmleigh Park School in Gloucester for Greenshaw Learning Trust. The works included: the creation of new, open gym spaces, a new changing village; refurbished visitor facilities; a new spin studio; a refurbished sports…
Read More →
, 09 Dec, 2024
A new Hydrogen Cell Technology Lab at Yeovil College. The project sees the creation of two new teaching laboratories, a new exhibition pod and the refurbishment of the Advanced Engineering Centre. The project was completed for September 2024 Client: Yeovil College Contractor: Jones Building Group Architect: Studio LIME Ltd MEP: MCCANN & PARTNERS LTD Structural:…
Read More →
, 16 Oct, 2019
This project saw the internal refurbishment and restoration of the first floor of St. Anthony’s Convent at Leweston School in order to convert a series of tired dormitories into a new Music School. This important 18th century Palladian building was substantially remodelled in the Art Decco style in 1929 by architect Maxwell Ayrton. During the…
Read More →
, 17 Oct, 2022
Located in the University of Bristol’s Grade II listed School of Geographical Sciences, the works saw the combining of a number of existing spaces to form a new teaching laboratory. Client: University of Bristol Main Contractor: Aztech Building Services Architects: Studio Lime Building Services: Smith Consult Structural Engineer: T M Ventham Planning Consultant: CSJ Planning